MELBOURNE, Australia, Oct. 30, 2026 /PRNewswire/ — LONGi Energy Storage showcased its utility-scale, commercial and industrial (C&I), and microgrid solutions at All Energy Australia 2026, demonstrating its integrated capabilities across diverse energy applications. Under its LONGi ONE strategy, LONGi Energy Storage continues to advance technology innovation and localized services to support Australia’s energy transition.

LONGi Energy Storage at All Energy Australia 2026
LONGi Energy Storage at All Energy Australia 2026

Solutions for Diverse Energy Applications

As Australia expands renewable energy deployment, energy storage is increasingly important for grid flexibility, energy cost optimization and reliable power supply.

OneMatrix Solution addresses utility-scale applications, including renewable energy projects, standalone grid-side storage and electricity market operations. Featuring flexible modular design and LONGiBank 3.0, it supports 2–8-hour duration and customized system configurations. Cluster-level independent management, AI-powered battery health diagnostics and intelligent O&M help improve operational efficiency and support long-term asset performance. The solution has received TÜV Rheinland certifications under IEC 62619, IEC 63056, and an IEC/EN 60730-1 Annex H report, reinforcing its safety credentials for international markets.

Hi-MO One Pro supports C&I applications with flexible 2-24-hour configurations for solar-plus-storage, peak-valley arbitrage, and backup power. Featuring LONGi’s proprietary iCCS and liquid-cooling technology, it supports grid-connected and off-grid operation, helping businesses optimize energy costs and enhance power supply security.

OneNexus H2 and M5 serve remote areas, mining operations and other locations with limited grid access. By coordinating solar, battery storage and diesel generation, they help increase renewable energy utilization, reduce diesel dependence and strengthen power supply resilience.

Project Experience Demonstrates Local Market Value

In Strathalbyn, South Australia, the Lunio Energy BESS project was connected to the grid in September 2026. Comprising four LONGiBank 2.0 systems with a total capacity of 5 MW/20 MWh, the project participates in Australia’s National Electricity Market (NEM), optimizing charging and discharging in response to electricity demand and market prices.

Advancing LONGi ONE Through Localized Services

LONGi continues to integrate proprietary technologies, system solutions and intelligent O&M under its LONGi ONE strategy, providing support from solution design and delivery through lifecycle operations. Through its "2830 Plan," LONGi aims to establish 30 comprehensive local service centers worldwide by the end of 2028, strengthening local responsiveness and lifecycle support.

With its full-stack capabilities, diverse solution portfolio and expanding local service network, LONGi Energy Storage will continue working with Australian customers and partners to deliver flexible, reliable and sustainable energy solutions.

Source link

This content was prepared by our news partner, Cision PR Newswire. The opinions and the content published on this page are the author’s own and do not necessarily reflect the views of Siam News Network
You May Also Like

Strider Launches Agentic Operating System to Power Next Generation of Strategic Intelligence

New intelligence operating system unifies intelligence delivery across Strider’s products to transform…

DeepL Voice preferred by 96% of professional linguists, outpacing leading competitors in spoken translation speed and accuracy

New study reveals DeepL Voice delivers higher-quality translations and more stable live captions…

Raytron's Non-Contact Thermal Imager Is Becoming a Game-Changer in Industrial Temperature Measurement

YANTAI, China, Nov. 3, 2025 /PRNewswire/ — From power grids and oil refineries…